BetaLaunch 1 Feb 2027: your account and name carry overRegisterJoin Discord
Base 1x / Job 1x / Drop 3x
  1. Wiki
  2. World
  3. Power Plant

Power Plant

Power Plant is three maps behind Varmundt's Mansion: 1st Power Plant, the Sewage Treatment Plant between them, and 2nd Power Plant. The way from 1st Power Plant back to the Mansion opens later in the story, and the way back from the Sewage Treatment Plant opens after a rescue.

Updated 8 November 2026power plantdungeonworldvarmundt's mansionsewage treatment plant
Power Plant is three maps behind Varmundt's Mansion: 1st Power Plant, the Sewage Treatment Plant between them, and 2nd Power Plant.

Entrance

Two warps lead down from Varmundt's Mansion. Neither warp has a requirement of its own.
  • Inside the Mansion at a warp leads to .
  • In the Mansion Garden at a warp leads to .

Exit

On 1st Power Plant at a warp leads back into Varmundt's Mansion at . This way is locked until the Varmundt story reaches step 6. Walking into it before then shows: There is still some work to be done here. Let's look around more.
On 2nd Power Plant at a warp leads back to . No requirement.

Floors

  • 1st Power Plant leads to the Sewage Treatment Plant at . No requirement on this side.
  • Sewage Treatment Plant leads back to 1st Power Plant at . This way is locked until the drowning person is rescued. Walking into it before then shows: There is still some work to be done here.
  • Sewage Treatment Plant leads to . No requirement on this side.
The rescue: a person in the water at . Talk to him and choose "Help him". Choosing "Ignore it" ends the talk with no progress. He then needs one Yggdrasil Leaf. Hand in one leaf. He is then rescued and appears as Dew. The way back opens after the rescue.
Entering from Special Border Area Cor: the door at is shut. The Rookie standing there says it is not open yet. It opens after a story step that this page does not cover. Arrival inside: .

Floor tables

1st Power Plant

MonsterLevelElementRaceSpawnsMVP
Elite Bellare143Ghost 1Demihuman90no
Spell Addicted Dolor145Ghost 1Demihuman80no
Released Spell144Ghost 2Formless50no
Broken Beta145Neutral 2Formless15no
Heart Hunter Skirmisher130Neutral 2Demihuman15no
Spawn total: 250.

Sewage Treatment Plant

MonsterLevelElementRaceSpawnsMVP
Sewage Cramp140Poison 1Brute80no
Sewage Venenum142Dark 2Demon60no
Sewage Waterfall141Poison 2Formless60no
Elite Bellare143Ghost 1Demihuman60no
Heart Hunter Skirmisher130Neutral 2Demihuman15no
Spawn total: 275.

2nd Power Plant

MonsterLevelElementRaceSpawnsMVP
Spell Addicted Plaga192Poison 3Demon80no
Spell Addicted Sanare194Holy 2Demihuman80no
Powerful Spell193Ghost 3Formless70no
Sharp Spell193Ghost 3Formless70no
Spawn total: 300.